FERRY SERVICE RESUMPTION

Rules for Craft Chartering

 

  1. For any confirmed reservations, half of the agreed payment must be settled by the charterer as the deposit. The balance must be paid within 7 days before the launch. If the chaterer requests cancellation of the reservation, there would be no refund of the deposit.
  2. The company would consider the launch as cancelled after 2 hours no shows. If there is no further instruction from the charterer, the launch would be regarded cancelled. All agreed payment must also be paid by the charterer. If the charterer requests to return to the destination before the appointed time, no compensation for the remaining time will be given. The extra-hours will also be charged accordingly if the over-time run is not requested before the launch.
  3. The charterer is liable and responsible for exceeding the licensed or agreed number of the passengers in all circumstances and the vessel should only sail within Hong Kong water, otherwise, the coxswain reserves the right nit to sell sail the vessel. The maximum number of hours for motor running for each chartering date is 4.5 hours. The normal number of hours for renting the craft is 8 hours during day-time and 4 hours during night-time before mid-night.
  4. Due to rough weather or security reasons, the coxswain reserves the right to choose a safer route and another destination for boarding. The charterer must board and disembark the vessel at the same pier, the charterer should also inform the company in advance in case of special arrangement.
  5. The company would count charter time form the time the craft waits upon the charterer (inclusive of such time the craft lines up for embarkation) until the last member of the charter party with the brought equipment has left.
  6. The charterer should make sure all furniture and equipment on board in the best condition, The charterer will be responsible for any damage caused by any of his party member. All equipment or facilities should be used under any applicable regulation of Hong Kong or the instruction of the person held responsible for the vessel on the date of the launch. The charterer should hold sole responsibility and compensate for all damages if there is any damage or injury caused by the violation of such rules.
  7. If the engine fails before sailing and cannot be repaired before launch the company will inform the charterer as soon as possible. Full return of the deposit amendment of the departure date or replacement of another vessel would be guaranteed. If customers request full rental amount return, the full rental amount will be given as well as 5% of the money paid.
  8. If the engine fails while sailing, the vessel should return immediately by all means. The chartering time will not to be compensated by the company if the charterer has used half of the chartering time or it has already reached the destination. Compensation launch could only be arranger on a weekday.
  9. All vessels are insured according to the law of Hong Kong. The charterer will solely carry the responsibility for the passengers and passenger’s property and neither our company (Agent) nor any of its officers, servants or Agents nor any vessel shall be reliable for any loss or damage to property or loss of life or personal injury whether through negligence or any other cause while on board of any craft or while boarding or disembarking from any vessel or other activity and whenever. Our company will not hold responsibility for any loss or damage but would report those to the Police.
  10. The followings will be applicable in case of typhoon:
  11. The vessel would still set sail if typhoon signal no. 1 or rainstorm red warning is hoister. There will be no cancellation or postponement even if higher typhoon signal is lowered to typhoon signal no.1 or rainstorm black warning is lowered to rainstorm red warning two hours before the appointed departure time. When the charterer requests to postpone the launch, the re-scheduled launch would only be on a weekday no matter the original departure date is on a weekday or a weekend. The charterer is also advised to keep close contact with our company.
  12. If typhoon signal no. 3 or higher is hoisted while sailing, the coxswain could choose to sail the vessel back to the closest pier according to the Marine Ordinance and Safety. Under no circumstances should compensation be given in such situations.
  13. If typhoon signal no. 3 or rainstorm black warning is hoisted at seven o’clock on the morning or before launch, the charterer will postpone all the scheduled launch on that day. If refund is requested, our company will return 50%of the total rental amount.
  14. If the departure date is re-scheduled because typhoon signal no. 3 or higher is hoisted, the postponed scheduled launch would still be on a weekday within the same year if the original launch date is on a weekday. In case the original date of the scheduled launch is on Sunday, public holiday or on Saturday, the re-scheduled date would be on any non-public holiday or a week day or the same kind of date after September in the same year. All document should be send to the company for date changing within one week, the company will consider the launch cancelled for any delay and the payment is non-refundable.
  15. If the craft cannot reach the appointed boarding pier, the charterer should board from the suggested pier. Our company will only compensate all the traveling expenses between the appointed and suggested pier.
  16. When boating cancellation or postponement occurs, our company will cancel reservations of refreshment. If the catering company has already prepared the refreshment or though other reasons and cancellation is not possible, the charterer will collect all the provisions at the appointed time and place.

 

Our company hold the principles of sincerity, handling different kinds of issues with great care in order to meet the needs of our customers. We observe the law of Hong Kong and provide customers with the safest routes for their travel.

 

 Important Notice:

No Drug allows on board; this is illegal, once discovered report to Police immediately, and NO Refund & Claim.

 


 

Severe weather arrangements

Typhoon Signal No. 3: Sam Ka Tsuen <-> Tung Lung Island ferry suspended
Typhoon Signal No. 8: All ferries suspended.

Severe weather arrangements
Coral Ferry Service’s arrangements during severe weather:
Since the navigation is highly affected by the sea condition, all ferries will be suspended when the Typhoon Signal No. 3 or above is hoisted or Black Rainstorm warning is issued.
For the safety of passengers, Coral Sea Ferry Service will arrange suspension and resumption based on the captain’s judgment and the environment assignment besides the Tropical Cyclone Warning Signals. Passenger can call the Customer Service to know more about the arrangements under different conditions.

Factors affect navigation:
1. Severe gale, freak waves and storm tides that affect ships’ stability and operation.
2. Sea conditions en route especially the safety concern about navigation in open water area.

珊瑚海船務有限公司 Coral Sea Ferry Service Co., Ltd.


珊瑚海航運有限公司 Coral Sea Shipping Co., Ltd.


租船熱線Service Hotline : 2368 8885


公司電話Office Tel. : 2513 1103


傳真FAX : 2513 8020


電郵E-mail : info@coralseaferryservice.com.hk


地址:香港西灣河太康街44號西灣河渡輪碼頭

Address : Sam Ka Tsuen Ferry Pier, Tai Hong Street, Sai Wan Ho, Shaukiwan, Hong Kong


Website : www.coralseaferryservice.com.hk